Concealed moisture

Concealed moisture beneath timber floor construction

Evidence

Instrument-led moisture assessment at defined test locations, with flooring removed to expose timber joists and concealed construction.

Challenge

Concealed moisture sometimes requires proportionate opening-up before drying can be verified.

Intervention

Specialist drying equipment and distribution hoses arranged across the floor to address retained moisture within or beneath the floor build-up.

Decision

Opening-up kept proportionate, with sound construction preserved where practicable.

Verification

Comparative readings at a defined floor or wall interface, taken at repeatable monitoring points rather than as isolated readings.